Trinity College

Jesse/Miller Field
Hartford, Connecticut

Trinity College required replacement of the over-used natural turf, multi-purpose field and resolution of chronic drainage problems. Gale entered into the first design-build “filled-turf” project as a subconsultant to Field Turf vendor, Northeast Turf. We completed the fast-track design-build project in 90 days from design through construction, as required by Trinity. Gale also performed base plan development with the GPS survey system and devised innovative turf anchoring methods within the existing track.